Erwat Sewage Plant Upgrade
Upgrade of the Olifantsfontein & Springs Belt Press machines
The main contractor WEC made use of Deo Volente to supply the Bellmer Belt press machines and do the engineering design and PLC configuration, installation and Commissioning. Tripple Option Trading consulted with Deo Valente to supply the Control & Instrumentation drawings, engineering, some of the instrumentation & installation & commissioning.
Supply and installation of cables, instrumentation, and the commissioning of all the instrumentation.
WEC built and supplied the MCC panels. Control systems installation and commissioning was done by Deo Volente & Tripple Option Trading. Artiflex did the drawings, and PLC configuration and commissioning of the system.